Prysmian wins Dutch innovation challenge

Prysmian Group’s plug-and-play MV cable concept has won the Dutch “Quick & Simple Substation” challenge. Designed for rapid, scalable deployment, the prefabricated system accelerates substation installations—reducing labor demands and aligning with Europe’s grid expansion goals amid rising energy transition pressures. Initial implementation begins in the Netherlands.

Prysmian Group has won the “Quick & Simple Substation” innovation challenge from Dutch grid operators AllianderEnexis, and Stedin. The company beat 13 competing submissions with a scalable medium-voltage (MV) substation solution that supports faster grid deployment.

The challenge focused on practical methods to strengthen Europe’s power grid as electricity demand rises. Prysmian’s concept targets faster installation, easier deployment, and repeatable designs that utilities can standardize across many sites.

Prysmian’s winning idea uses a plug-and-play MV cable system with flexible, prefabricated cables and plug-in connections. This design simplifies substation work, cuts on-site time, and enables quicker, technician-friendly installation.

Operators will first deploy the solution in the Netherlands, then consider broader international use. Prysmian says the template can help hundreds of power networks speed grid upgrades and improve resilience worldwide.

Share
Subscribe to the Wire Journal

Wire Journal International (WJI) is the leading technical publication for the wire and cable industry.

Published monthly, WJI is written for executives, engineers, technical and sales professionals, and purchasing agents engaged in the manufacture of ferrous and nonferrous wire and cable.

WJI Feature Stories

See a preview of the most recent Wire Journal International feature. Subscribe to the FREE publication to read the entire issue.

Related Stories