Wirenet Image Band
wirenet.org mobile image band

The Book of Terms

Surface Conditioning

Blooms and billets can be conditioned to minimize surface imperfections. Methods employed may include scarfing, chipping or machine grinding. The depth of conditioning should not exceed 19.05 mm (0.750 in.), and the width of the conditioning should be at least four times its greatest depth.

Contact us

The Wire Association Int.

71 Bradley Road, Suite 9

Madison, CT 06443-2662

P: (203) 453-2777